A practical checklist for retailers, food operators, medical providers, office tenants and commercial tenants
We'll send the 17 Costly Fitout Mistakes checklist straight to your email shortly.
Add your details and we'll send it right over.
Finding the right commercial tenancy can feel exciting. But the real cost of a commercial lease is rarely only the rent. Commercial and shopping centre leases can place significant responsibility back onto the tenant — design approvals, consultant coordination, authority approvals and certification among them.
This checklist has been created to help you pause before signing and ask better questions. It does not replace legal, financial, building certification or project-specific design advice — but it will help you identify where tenants can be caught out before the business has even opened.
The mistake is rarely one single item. It's usually the chain reaction that follows.
Specific designers, consultants, certificates, finishes, signage, hoarding, access procedures or approved contractors may be required.
Extra costs may arise for structural engineering, certifiers, electrical upgrades, fire services, hydraulic services, mechanical works, design amendments or make good.
You may not be allowed to start works, remove hoarding or open for trade until approvals and certificates are complete.
Rent, outgoings, staff, stock, builder payments and finance costs may continue even if the tenancy is not trading.
If you've provided a personal guarantee, director guarantee, bank guarantee or personal asset security, the risk may extend beyond the business.
Not every tenancy suits every business. Ask: has anyone confirmed this tenancy can lawfully support my proposed use?
A cheaper designer may become expensive if drawings are rejected or incomplete. Ask: can they produce documentation the landlord and certifier will accept?
Most tenancies need changes to air conditioning, fire, hydraulic or electrical services, done by landlord-approved contractors. Ask who pays.
Landlord approval may relate only to the look. Ask: does this cover compliance, or do I need separate building and certification approvals?
In Queensland, commercial fitout design may require legal authorisation. Ask: is my designer legally authorised and insured?
Power, plumbing, drainage, air conditioning, exhausts and fire services may not suit your business. Confirm what's available and what upgrades may be required.
A lease line may sit near fire hydrants or hose reels, which may need to be incorporated at the tenant's cost.
A space may look finished and still not be approved to trade. Confirm what certificates are required, and who obtains them.
Structural certification may be required for shopfronts, glazing, signage, partitions, ceilings and overhead elements.
Electrical work may need checks before works start and again before trade — build this into your programme.
A quote based on incomplete drawings or unknown approvals may lead to variations — the builder may be pricing assumptions, not the true scope.
Incentives can come with conditions, timing limits, exclusions and clawback provisions — you may still owe outgoings, levies and fees during it.
Turnover is money coming in before expenses — not the same as profit. Some leases charge additional rent on turnover above a threshold.
Make good can require removing fitout works, reinstating finishes, signage and services at the end of the lease. Know the scope upfront.
A landlord may require bank guarantees, deposits or personal guarantees. Get legal and financial advice before you commit personal assets.
A lease is a legal commitment. If the business fails, you may still owe rent, outgoings, make good and other lease obligations.
The most expensive mistakes happen before the designer or builder is properly engaged — when the lease is signed without understanding the full pathway ahead.
Red flags are not there to stop you. They are there to slow you down before the mistake becomes expensive.
Before signing a lease or committing to a builder, it's worth understanding whether the space can support your business operationally, commercially and practically. Book a pre-lease fitout discussion with Leithal Designs — 25+ years across commercial sectors on the Gold Coast and Brisbane.
This checklist is general in nature, prepared for educational purposes only. It does not replace project-specific advice from a qualified designer, builder, certifier, town planner, engineer, solicitor, accountant or financial advisor. Leithal Designs provides commercial interior design and building design services and does not provide legal, financial or lease negotiation advice.